SC

Ireland solar

Site Copilot

Interpreted brief23 Mar 2026Completed

Find lower-risk utility-scale solar opportunities in Ireland with decent grid access.

This generated screening keeps the same coarse-ranking structure but adapts the brief and shortlist emphasis to the new prompt.

Scope guardrails

  • Only explains the active screening context.
  • Uses deterministic candidate ranking and coarse proxy scores.
  • Flags missing diligence instead of inventing parcel-level certainty.

Candidate map

Ranked search space

Grid proxyPlanning dragSearch geometry
Database-backed screening

Shortlist

Candidate ranking

4 areas

Priorities

Lower planning riskReasonable grid proximity
Assumption: Grid access is scored by coarse infrastructure proximity, not queue position.
Assumption: The user prefers lower-risk delivery over marginal resource upside.
Assumption: Planning conflict screening is indicative and should trigger document review, not replace it.
Assumption: This run is generated by a deterministic local backend placeholder, not a live GIS engine yet.

Missing diligence

Detailed connection feasibility
Land control and ownership
Parcel-specific ecology and heritage checks