Find lower-risk utility-scale solar opportunities in Ireland with decent grid access.
This generated screening keeps the same coarse-ranking structure but adapts the brief and shortlist emphasis to the new prompt.
Scope guardrails
- Only explains the active screening context.
- Uses deterministic candidate ranking and coarse proxy scores.
- Flags missing diligence instead of inventing parcel-level certainty.
Candidate map
Ranked search space
Grid proxyPlanning dragSearch geometry
Database-backed screening
Shortlist
Candidate ranking
Priorities
Lower planning riskReasonable grid proximity
Assumption: Grid access is scored by coarse infrastructure proximity, not queue position.
Assumption: The user prefers lower-risk delivery over marginal resource upside.
Assumption: Planning conflict screening is indicative and should trigger document review, not replace it.
Assumption: This run is generated by a deterministic local backend placeholder, not a live GIS engine yet.
Missing diligence
Detailed connection feasibility
Land control and ownership
Parcel-specific ecology and heritage checks